CU-CCMS
News & Updates

Significant HPC System Upgrade from Sun Microsystems, Inc.:

CU-CCMS and Sun Microsystems have significantly enhanced our compute grid portion of the HPC system.  The new system is compromised of 430 Sun Blade 6250's each with 2 quad-core Intel low wattage CPU's and 32 Gb of RAM.  This is a total of 35 TFlops of compute-power and 14 TBytes of RAM with Voltaire DDR infiniband interconnect.  The impressive compute grid upgrade gives us 500% increase in teraflops, 200% increase in RAM and 200% increase in interconnect bandwidth.  Electrical power and cooling requirements have been minimized by choosing Intel's Xeon L5420 lower wattage CPU's giving us a much "greener" system (about 275 GFlops per kW of electric power).

For a complete, balanced HPC system we have three enterprise class servers and storage capabilities.  These include an E25K with 144 processing cores and 680 Gb of RAM and 2 E6900's each with 48 processing cores and 384 Gb of RAM.  For storage we have 40 TBytes of disk space and a L700 back-up and archival system.

This system is owned and operated by CU-CCMS, the entire Sun HPC system is dedicated for the exclusive use of the technical staff who are focused on delivering cost effective and fast turnaround-time solutions to clients within time and within budget.

Click for larger view
 
Click for larger view
 

  

SAE 2008

Thank you for joining us at the SAE World Congress in Detroit!  Click here for our CU-CCMS flyer in case you missed our presentation. 

For more information about our SAE activities, please contact Casandra Gibson at casandg@clemson.edu or (864) 283-7300.