Revision Log

03/25/2009: Section 21 30 00 - Relocated this section to Section 28 30 00.

03/25/2009: Section 28 30 00 -Changed the designation of the sole source supplier of fire alarm equipment and services from Johnson Controls Inc. to Simplex-Grinnell.

04/01/2009 Revision Log Reformatted Revision Log and placed at end of document.

04/02/2009 Section 22 42 00 Added statement prohibiting waterless urinals.

06/09/2009 Section 32 80 00 Added information concerning Owner’s option for installing underground sprinkler systems and specified Weathermatic irrigation systems.

09/07/2009 Section 22 44 00 Specified that basic water fountains be installed in both new and renovated facilities instead of the previously used electric water coolers. No hot water dispensers are to be included with the water fountain.

09/08/2009 Section 09 60 00 Changed flooring instructions to not allow VCT type products requiring labor and material intensive costs and to reduce environmental impact. (Tom Jones)

11/18/2009 Section 26 05 00 Hangers and Supports for Electrical Systems – Added statement that single conduits are to be supported by means of clamps to the building structure or pipe hangers supported by steel all-thread rods from ceiling inserts or building structure. (Bret McCarley)

11/18/2009 Section 26 05 00 277/480 volt systems: Changed Phase B color to Orange; changed Phase C color to Yellow; changed Neutral color to Gray or White. (Bret McCarley)

11/18/2009 Section 26 05 00 Identification of Electrical Systems: Revise sentence to read – Specify that conductors size #6 AWG or smaller are to be color coded with solid color insulation, and that ……..conductor ends may be used on larger sizes. (Bret McCarley)

11/18/2009 Section 26 05 00 Raceways: Revise sentence to read: Conduit shall be installed with no more than 360 degrees of bend and 100’ of length between pull boxes. (Bret McCarley)

11/18/2009 Section 26 05 00 Raceways: Revised specification for the use of flexible conduit to read: The maximum length of flexible conduit shall be 6’. (Bret McCarley)

11/18/2009 Section 26 10 00 Existing Systems and Design Information: Revise paragraph to read University power is transmitted at 4160 or 12,470 volt wye, 3 phase, 4 wire, 60 cycle AC. The existing 4160 volt system is in the process of being phased out and should not be used to power new construction unless written authorization is given by the Clemson University Utilities Director. The paragraph immediately following this was relocated. See following revision. (Bret McCarley)

11/18/2009 Section 26 10 00 Substations: Add: Secondary voltage within the facility shall be distributed at 120/208 volts, 3 phase, equipment in the facility will be capable of utilizing a 480Y/277 volt system. The final selection of voltage should be based upon……… (Bret McCarley)

11/18/2009 Section 26 50 00 Interior Lighting: Lighting voltage shall be 277 volts when available. (Bret McCarley)

11/18/2009 Section 26 50 00 Interior Lighting: Specify the use of energy efficient fixtures wit electronic ballasts and T-8 tubes. Current T-8 standard is GE*32MAX-N-ULTRA ballasts and F28T8/XL/SPX41/ECO lamps. (Bret McCarley)

11/18/2009 Division 26 Products and Materials: Medium Voltage Distribution: Switches: G & W or S & C SF6 to match existing switches in the system. (Bret McCarley)

01/19/2010 Division 23 Products and Materials: Pumps: Added Patterson Pumps as an acceptable pump supplier. (Eddie Herring, Mike Parker, OK by Bob Wells)

01/19/2010 Section 22 42 00 Added provision specifying the use of remote sensor lavatory faucets in new facilities. (Bob Wells, Allen Lohmann)

01/19/2010 Section 00 03 00 Temporary Utilities: revised information concerning charge back for temporary utilities. (John McEntire, Tony Putnam)

01/19/2010 Section 33 00 00 Design: Clarified information concerning charge back for temporary utilities. (John McEntire, Tony Putnam)

07/29/2010 Section 22 11 00 Facility Water Distribution: Re-stated the requirement to comply with the Safe Drinking Water Act as applies to domestic water supply piping and piping materials – i.e., use of lead solder and piping. This regulation was already in place in Division 0.

07/29/2010 Section 33 10 00 Water Utilities: Re-stated the requirement to comply with the Safe Drinking Water Act as applies to domestic water supply piping and piping materials – i.e., use of lead solder and piping. This regulation was already in place in Division 0.

8/31/2010 Section 08 70 00 Finish Hardware: Clarified and expanded requirements for the selection and specification of Finish Hardware.

8/31/2010 Division 08 Products and Materials: Created listing for acceptable Finish Hardware.

9/1/2010 Division 22 Products and Materials: Added Viega ProPress compression fittings as acceptable Fittings for Copper Pipe.

10/25/2010 Section 23 05 00 Specified requirement for steam meters to provide connectivity to Johnson Control Metasys system. (Tony Putnam)

10/25/2010 Division 23 Products and Materials: Change specification for Steam Flow Meter and Chilled Water Meter. (Tony Putnam)

10/25/2010 Section 26 20 00 Specified requirement for sub-metering and connectivity to Johnson Control Metasys system. (Tony Putnam)

10/25/2010 Division 26 Products and Materials: Changed specification for electric Meters. (Tony Putnam)

10/25/2010 Section 33 10 00 Water Utility Metering: Specified Combination Meters for potable water system and standard meters for irrigation system. (Tony Putnam)

9/25/2012 Section 00 01 00 Drawings: Reference to CAD format and new sub paragraph 13.3

9/25/2012 Section 00 03 00 Design Parameters: Additional emphasis on not permitting hazardous materials. New room numbering guidelines

9/25/2012 Section 00 04 00 General Information: Additional emphasis on not permitting asbestos materials

9/25/2012 Section 00 05 00 Sustainable Design: Hyperlink to LEED scorecard

9/25/2012 Section 00 62 39 Minority Business Enterprise Certification procedures added

9/25/2012 Section 01 14 00 Work Restrictions added

9/25/2012 Section 1 31 00 Project Management and Coordination: Clarification of Special Inspections

9/25/2012 Section 01 32 00 Construction Progress Documentation: Requests for photographic documentation on major projects

9/25/2012 Section 01 35 53 Security Procedures new section

9/25/2012 Section 01 55 00 Vehicular Access and Parking new section

9/25/2012 Section 01 55 29 Staging Areas new section

9/25/2012 Section 01 56 00 Temporary Barriers new section

9/25/2012 Section 01 56 16 Noise and Dust Control new section

9/25/2012 Section 02 26 00 Hazardous Materials Assessment: New emphasis on hazardous Materials

9/25/2012 Section 04 00 00 Design Guidelines: New hyperlink to Planning document

9/25/2012 Section 06 00 00 Woods, Plastics, and Composites: Added references to fire retardant and pressure treated wood use conditions

9/25/2012 Section 07 55 00 Green Roof Systems: New Section

9/25/2012 Division 8 Products and Materials: Required mortise locksets

9/25/2012 Section 08 10 00 New building must have mechanically assisted door

9/25/2012 Section 09 60 00 Resilient Flooring: Added MCT to recommended flooring

9/25/2012 Section 10 10 00 Signage: Revised wording to comply with ADA

9/25/2012 Section 10 20 00 Interior Specialties: Rewording of toilet and bath accessories. Solid surface partitions and countertops preferred

9/25/2012 Division 10 Products and Materials: Owner will provide Soap Dispenser and Sanitary Napkin Dispenser. New specific bath accessories

9/25/2012 Section 12 48 13 Entrance Floor Mats and Frames: New section

9/25/2012 Section 13 00 00 General Information: New comment on special construction

9/25/2012 Section 21 10 00 Water-Based Fire Suppression Systems: New hyperlink to Reliable Sprinkler

9/25/2012 Division 22: Added Vacuum Breaker and comment on water meter

9/25/2012 Section 22 07 00 Plumbing Insulation clarification

9/25/2012Section 23 20 00 HVAC Piping and Pumps: Comment on insulation

9/25/2012 Section 23 30 00 HVAC Air Distribution: Comment on insulation

9/25/2012 Division 23 Products and Materials: Steam Flow and Chilled Water Meter

9/25/2012 Section 26 05 13 Medium Voltage Cables: Hyperlink to Spec Sheet

9/25/2012 Section 26 05 19 Low Voltage Cables: Comment on LVC

9/25/2012 Section 27 10 00 Communication Systems: Added comments and hyperlink to a new CCIT document

9/25/2012 Section 32 00 00 Exterior Improvements: New Division added

9/25/2012 Section 33 00 00 General Information and Design Guidelines: New comment on Submetering

9/25/2012 Section 33 11 13 Public Water Utility Distribution Piping: Added hyperlink to new document showing water riser entry

5/1/2013 Section 09 60 00 Revised flooring requirements

5/22/2013 Division 32 Products and Materials: Irrigation systems

10/1/2013 Section 00 01 00 Revised CAD drawing requirements

10/1/2103 Section 01 50 00 & 02 21 00 Additional survey information