Table of Contents - Section 100
Part 100 - Swine Facilities (Any segment loads the entire Section 100 and requires 122 seconds)
100.10 Purpose, Applicability, Inactive Facilities, and Facilities Permitted Prior to the Effective Date of Regulation
- Purpose
- Applicability
- Inactive Facilities
- Facilities Permitted Prior to the Effective Date of Regulation
100.20 Permits and Compliance Period
- Permit Requirement
- Individual NPDES Permit
- No-discharge permits
- Requirements
- Land Appliers of Swine manure
- Notification Requirements
- Permit Modification
- Permit Modifications resulting in expansion
100.30 Exclusions
- Existing swine facilities
- Swine facilities w/ less than 10,000 pounds
- Swine facilities w/ less than 30,000 pounds
- Ranged Swine Facilities
- Non-commercial swine facilities
- Replacement in Kind
- Exempted Facilities
100.40 Relationship to Other Regulations
100.50 Permit Application Requirements (Animal Facility Management Plan Submission Requirements)
- Preliminary Site Evaluations
- Information to be included in application package
- Additional Information may be required
- Format of Submittal
- Incomplete application packages
- Applications for permit modifications
100.60 Public Notice Requirements
- Small swine facility requirements
- Large swine facility requirements
- Additional requirements for Large swine facilities with 1,000,000 pounds
- Properties with multiple owners
- Comments received by e-mail
- Comments received
- Permit Decision
- Permit Issuances
- Permit Denials
- Permit Denials
- Information included in Public Notices
100.70 Permit Decision Making Process
- Complete Application Package
- Zoning and Land Use
- Technical review of the application package
- Site inspection
- Cumulative Impacts
- Prevent increase in pollution
- Cumulative & Secondary effects
- Minimum Setback Limits
- Permit Appeals
- Effective Date of Permit
- Start of Construction
- Certification/Authorization to Begin Operations
- Final Inspection
- Written Authorization
- Construction Expiration Dates & Extensions
- Permit Renewal
- Expired Permits
- Permit Renewal Applications
- Permits for Contract Growers
100.80 Swine Facility, Lagoon, Treatment System, and Manure Storage Pond Siting Requirements
- Setbacks for Small Swine Facilities
- Setbacks for Large Swine Facilities w/ less than 1,000,000 pounds
- Setbacks for Large Swine Facilities w/ 1,000,000 pounds or more
- 100-year Floodplain
- Farm Ponds
- Lagoon setback measurements
- Minimum Siting Requirements may be increased
100.90 General Requirements for Swine Manure Lagoons, Treatment Systems, and Swine Manure Storage Ponds
- Designer Qualifications
- Design Requirements
- Liner Requirements
- Volume Restrictions
- Treatment Requirements for Large Swine Facilities w/ less than 1,000,000 #’s
- Treatment Requirements for Large Swine Facilities w/ 1,000,000 #’s or more
- Impact to Groundwater
- Separation requirements from groundwater
- Groundwater Monitoring Wells
- Groundwater Monitoring Frequency
- Establishing background concentration levels
- Site Preparation Prior to Construction
- Automated Lagoon Level Monitoring
- Water Levels
- Lagoon Breach
- Fence Requirements
- Warning signs
- Vegetation
- Restricting animal access
- Lagoon Phase-out
100.100 Manure Utilization Area Requirements
- Application Rates
- Constitiuent Limits and Requirements for land application fields
- Setbacks for Manure Utilization Areas
- Additional Permitting Restrictions
- Permit Conditions
- Groundwater Monitoring for Manure Utilization Areas
- Periodic Monitoring of ditches and streams
100.110 Spray Application System Requirements
- Utilizing Irrigation Equipment
- Spray Application Prohibitions
- Manure Utilization Area Slopes
- Uniform Distribution
- Hydraulic Application Rates
- Separation requirements from groundwater
- Conservation requirements
- Groundwater Quality Monitoring Systems
- Adverse Trend in Groundwater Quality
- Prevention of Drift from spray application
100.120 Frequency of Monitoring for Swine Manure
- Representative Samples
- Constituents monitored
- Waiver for constituents
- Collection Procedures
100.130 Dead Swine Disposal Requirements
- Dead Swine Disposal Plan Requirements
- Burial
- Incinerators
- Composters
- Landfill Disposal
- Disposal Prohibitions
- Other Methods of disposal
100.140 Other Requirements
- Discharge Prohibitions
- Additional or more Stringent Requirements
- Cases Evaluated for more Stringent Requirements
- Adverse Impact to Waters
- Manure Release Restrictions
- Swine medical waste
- Event of Discharge
- Nuisance Correction
- Access Roads
- Transporting manure
100.150 Odor Control Requirements
- Odor Abatement Plan
- Best Management Practices
- Undesirable Level of Odor
- Remediation
- Control & Abatement Practices
- Complaints
- Odor problems at land application sites
100.160 Vector Control Requirements
- Vector Abatement Plan
- Nuisance Restrictions
- Remediation
- Control & Abatement Practices
100.170 Record Keeping
- Animal Facility Management Plan & Permits
- Application information
- Records for each manure utilization area
- Records for the facility
- Records for the Lagoon, treatment system or manure storage pond
- Location of Records
- Availability of Records
100.180 Reporting
- Large Swine Facility Reporting Requirements
- Small Swine Facility Reporting Requirements
- Comprehensive Reports
100.190 Training Requirements
- Existing Farms
- Large Swine Facilities
- New Facility Completion Requirements
- Existing Facility Completion Requirements
- Maintaining Training/Certification
- Failure to obtain Training/Certification
- Additional Training & Certification Requirements for Large Swine Facilities with 1,000,000 pounds or more
100.200 Violations
- Violating the regulation
- Large Swine Facility Automatic Penalties
- Second Occurrences
- Cessation of manure application
- Falsifying, tampering with monitoring devices