Table of Contents - Section 200

Part 200 - Animal Facilities (other than swine)(Any segment loads the entire Section 200 and requires 98 seconds)

200.10 Purpose, Applicability, Inactive Facilities and Facilities Permitted Prior to the Effective Date of Regulation

  • Purpose
  • Applicability
  • Inactive Facilities
  • Facilities Permitted Prior to the Effective Date of Regulation

200.20 Permits and Compliance Period

  • Permit Requirement
  • No-discharge permits
  • Requirements
  • Land Appliers of Animal manure
  • Notification Requirements
  • Permit Modification
  • Permit Modifications resulting in expansion

200.30 Exclusions

  • Existing animal facilities
  • Animal facilities w/ less than 10,000 pounds
  • Animal facilities w/ less than 30,000 pounds
  • Ranged Animal Facilities
  • Non-commercial Animal facilities
  • Replacement in Kind
  • Exempted Facilities
200.40 Relationship to Other Regulations

200.50 Permit Application Requirements (Animal Facility Management Plan Submission Requirements)

  • Preliminary Site Evaluations
  • Information to be included in application package
  • Additional Information may be required
  • Format of Submittal
  • Incomplete application packages
  • Applications for permit modifications

200.60 Public Notice Requirements

  • New Animal facility requirements
  • Properties with multiple owners
  • Expansions of existing animal facilities
  • Comments received
  • Comments received by e-mail
  • Comments considered
  • Permit Decision
  • Permit Issuances
  • Permit Denials
  • Permit Denials
  • Information included in Public Notices

200.70 Permit Decision Making Process

  • Complete Application Package
  • Zoning and Land Use
  • Technical review of the application package
  • Site inspection
  • Prevent increase in pollution
  • Minimum Setback Limits
  • Permit Appeals
  • Issue & Effective Date of Permit
  • Permit Expiration Date
  • Permit Renewal Applications
  • Start of Construction
  • Certification/Authorization to Begin Operations
  • Final Inspection
  • Written Authorization
  • Construction Expiration Dates & Extensions

200.80 Animal Facility, Lagoon, Treatment System, and Animal Manure Storage Pond Siting Requirements

  • Siting Requirements applicable to all animal facilities
  • Siting Requirements for lagoons, storage ponds & treatment systems
  • Siting Requirements for dry manure stacking sheds & composters
  • Farm Ponds
  • Lagoon setback measurements
  • Minimum Siting Requirements may be increased
  • Written Waivers for setbacks
  • Silvicultural & Agricultural Setback Exemptions

200.90 General Requirements for Animal Manure Lagoons, Treatment Systems, and Animal Manure Storage Ponds

  • Designer Qualifications
  • Design Requirements
  • Liner Requirements
  • Impact to Groundwater
  • Separation requirements from groundwater
  • Groundwater Monitoring Wells
  • Groundwater Monitoring Frequency
  • Establishing background concentration levels
  • Site Preparation Prior to Construction
  • Water Levels
  • Lagoon Breach
  • Fence Requirements
  • Warning signs
  • Vegetation
  • Restricting animal access
  • Lagoon Phase-out

200.100 Manure Utilization Area Requirements

  • Application Rates
  • Constitiuent Limits & Requirements for land application
  • Setbacks for Manure Utilization Areas
  • Additional Permitting Restrictions
  • Permit Conditions
  • Groundwater Monitoring for Manure Utilization Areas
  • Treatment for odor control prior to land application

200.110 Spray Application System Requirements

  • Utilizing Irrigation Equipment
  • Manure Utilization Area Slopes
  • Uniform Distribution
  • Hydraulic Application Rates
  • Separation requirements from groundwater
  • Conservation requirements
  • Groundwater Quality Monitoring Systems
  • Adverse Trend in Groundwater Quality
  • Prevention of Drift from spray application

200.120 Frequency of Monitoring for Animal Manure

  • Representative Samples
  • Constituents monitored
  • Waiver for constituents
  • Collection Procedures

200.130 Dead Animal Disposal Requirements

  • Dead Animal Disposal Plan Requirements
  • Burial
  • Incinerators
  • Composters
  • Landfill Disposal
  • Disposal Prohibitions
  • Other Methods of disposal

200.140 Other Requirements

  • Discharge Prohibitions
  • Additional or more Stringent Requirements
  • Cases Evaluated for more Stringent Requirements
  • Adverse Impact to Waters
  • Manure Release Restrictions
  • Animal medical waste
  • Event of Discharge
  • Nuisance Correction
  • Access Roads
  • Transporting manure

200.150 Odor Control Requirements

  • Odor Abatement Plan
  • Best Management Practices
  • Undesirable Level of Odor
  • Remediation
  • Control & Abatement Practices
  • Odor problems at land application sites

200.160 Vector Control Requirements

  • Vector Abatement Plan
  • Nuisance Restrictions
  • Remediation
  • Control & Abatement Practices

200.170 Record Keeping

  • Animal Facility Management Plan & Permits
  • Application information
  • Records for each manure utilization area
  • Records for the facility
  • Records for the Lagoon, treatment system or manure storage pond
  • Location of Records
  • Availability of Records

200.180 Reporting

  • Large Animal Facility Reporting Requirements
  • Small Animal Facility Reporting Requirements
  • Comprehensive Reports

200.190 Training Requirements

  • Operators of Existing Facilities and land application areas
  • New Facilities & Large Animal Facilities
  • New Facility Completion Requirements
  • Existing Facility Completion Requirements
  • Maintaining Training/Certification
  • Failure to obtain Training/Certification

200.200 Violations

  • Violating the regulation
  • Falsifying, tampering with monitoring devices