Part 400 - Manure Broker Operations (Any segment loads the entire Section 400 and requires 51 seconds)
400.10 Purpose and Applicability
400.20 Permits and Compliance Period
400.30 Relationship to Other Regulations.
400.40 Permit Application Requirements (Broker Management Plan Submission Requirements)
400.50 Permit Decision Making Process.
400.60 Manure Utilization Area Requirements.
400.80 Odor Control Requirements
400.90 Vector Control Requirements