Skip to content
lakeside construction site with exposed soil and barriers in place to protect drains
Certified Erosion Prevention & Sediment Control Inspector Program

CEPSCI Acronyms

BMP – Best Management Practices

CEPSCI – Certified Erosion Prevention and Sediment Control Inspector

CGP – Construction General Permit

CWA – Clean Water Act

CZC – Coastal Zone Consistency

ECB – Erosion Control Blanket

EPA – United States Environmental Protection Agency

EPSC –Erosion Prevention and Sediment Control

HECP – Hydraulically applied Erosion Control Product

LOD – Limits of Disturbance

MS4 – Municipal Separate Storm Sewer System

NOI – Notice of Intent

NOT – Notice of Termination

NPDES – National Pollutant Discharge Elimination System

ORW – Outstanding Resource Waters

PRECON – Preconstruction Meeting

SCDES / DES – South Carolina Department of Environmental Services

SCDOT / DOT – South Carolina Department of Transportation

SWO – Stop Work Order

SWPPP – Storm Water Pollution Prevention Plan

TRM – Turf Reinforcement Mat

TSB / SB – Temporary Sediment Basin

CEPSCI
CEPSCI |